Hokkaido Region

Hokkaido
Hokaido Nemuro City
Hybrid Plant(18places)

Interconnected Day March 29, 2021
Address Nemuro City,Hokkaido prefecture
PV System Size 1.5 MW
Expected Annual Power Generation 1,867,569 kWh
Panel Manufacturer ソーラー フロンティア

Approx. 1,867,569kWh
Standard Home:about 329 households
Approx. 592t
Plantation:about 42,254 Japanese cedars
Approx. 423t
about 2,160 drums


Hokkaido
Hokaido Nemuro City
Hybrid Plant(4places)

Interconnected Day March 29, 2021
Address Teshio Town,Hokkaido prefecture
PV System Size 0.33 MW
Expected Annual Power Generation 415,015 kWh
Panel Manufacturer ソーラー フロンティア

Approx. 415,015kWh
Standard Home:about 73 households
Approx. 131t
Plantation:about 9,390 Japanese cedars
Approx. 94t
about 480 drums

Tohoku Region

Yamagata
Murayama City
Mega Solar Plant

Interconnected Day September 1, 2014
Address Murayama City,Yamagata Prefecture
PV System Size 1.4 MW
Expected Annual Power Generation 1,313,831 kWh
Panel Manufacturer ReneSolar

Approx. 1,313,831kWh
Standard Home:about 231 households
Approx. 416t
Plantation:about 29,725 Japanese cedars
Approx. 297t
about 1,519 drums


Akita
Oodate City
Mega Solar Plant

Interconnected Day July 22, 2015
Address OodateCity,Akita Prefecture
PV System Size 1.9 MW
Expected Annual Power Generation 1,519,263 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 1,519,263kWh
Standard Home:about 267 households
Approx. 481t
Plantation:about 34,373 Japanese cedars
Approx. 343t
about 1,756 drums


Iwate
VITEC Isaribikan Takizawa City
Mega Solar Plant

Interconnected Day December 15, 2015
Address Takizawa City,Iwate Prefecture
PV System Size 20.8 MW
Expected Annual Power Generation 26,308,187 kWh
Panel Manufacturer Canadian Solar

Approx. 26,308,187kWh
Standard Home:about 4,629 households
Approx. 8,333t
Plantation:about 595,222 Japanese cedars
Approx. 5,952t
about 30,422 drums


Miyagi
Kurihara City
Mega Solar Plant

Interconnected Day January 24, 2017
Address Kurihara City,Miyagi Prefecture
PV System Size 1.2 MW
Expected Annual Power Generation 1,194,236 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 1,194,236kWh
Standard Home:about 210 households
Approx. 378t
Plantation:about 27,019 Japanese cedars
Approx. 270t
about 1,380 drums


Miyagi
Oosaki City
Mega Solar Plant

Interconnected Day March 27, 2017
Address Oosaki City,Miyagi Prefecture
PV System Size 1.8 MW
Expected Annual Power Generation 1,733,585 kWh
Panel Manufacturer ReneSolar

Approx. 1,733,585kWh
Standard Home:about 305 households
Approx. 549t
Plantation:about 39,222 Japanese cedars
Approx. 392t
about 2,004 drums


Aomori
Rokunohe Town Solar Park

Interconnected Day August 1, 2017
Address RokunoheTown,Aomori Prefecture
PV System Size 22 MW
Expected Annual Power Generation 20,903,000 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 20,903,000kWh
Standard Home:about 3,678 households
Approx. 6,621t
Plantation:about 472,930 Japanese cedars
Approx. 4,729t
about 24,171 drums


Miyagi
Taiwa Town
Mega Solar Plant

Interconnected Day October 13, 2017
Address Taiwa Town,Miyagi Prefecture
PV System Size 2.8 MW
Expected Annual Power Generation 2,527,288 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 2,527,288kWh
Standard Home:about 444 households
Approx. 800t
Plantation:about 57,179 Japanese cedars
Approx. 571t
about 2,922 drums


Miyagi
Naruko-Onsen NO.1
Mega Solar Plant

Interconnected Day October 31, 2017
Address Naruko-Onsen,Oosaki City ,Miyagi Prefecture
PV System Size 1.8 MW
Expected Annual Power Generation 1,883,209 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 1,883,209kWh
Standard Home:about 331 households
Approx. 596t
Plantation:about 42,607 Japanese cedars
Approx. 426t
about 2,177 drums


Miyagi
Naruko-Onsen NO.2
Mega Solar Plant

Interconnected Day October 31, 2017
Address Naruko-Onsen,Oosaki City ,Miyagi Prefecture
PV System Size 2.1 MW
Expected Annual Power Generation 2,024,956 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 2,024,956kWh
Standard Home:about 356 households
Approx. 641t
Plantation:about 45,814 Japanese cedars
Approx. 458t
about 2,341 drums


Miyagi
Naruko-Onsen NO.3
Mega Solar Plant

Interconnected Day October 31, 2017
Address Naruko-Onsen,Oosaki City ,Miyagi Prefecture
PV System Size 1.3 MW
Expected Annual Power Generation 1,187,974 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 1,187,974kWh
Standard Home:about 209 households
Approx. 376t
Plantation:about 26,877 Japanese cedars
Approx. 268t
about 1,373 drums


Miyagi
Tome City
Mega Solar Plant

Interconnected Day December 22, 2017
Address Tome City,Miyagi Prefecture
PV System Size 2.5 MW
Expected Annual Power Generation 2,760,439 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 2,760,439kWh
Standard Home:about 485 households
Approx. 874t
Plantation:about 62,454 Japanese cedars
Approx. 624t
about 3,192 drums


Miyagi
Naruko-Onsen NO.4
Mega Solar Plant

Interconnected Day June 22, 2018
Address Naruko-Onsen,Oosaki City ,Miyagi Prefecture
PV System Size 1.2 MW
Expected Annual Power Generation 1,096,591 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 1,096,591kWh
Standard Home:about 192 households
Approx. 347t
Plantation:about 24,810 Japanese cedars
Approx. 248t
about 1,268 drums

Kanto Region

Tochigi
Nasushiobara City Aoki
Mega Solar Plant

Interconnected Day March 25, 2013
Address Aoki,Nasushiobara City,Tochigi Prefecture
PV System Size 1.9 MW
Expected Annual Power Generation 2,687,168 kWh
Panel Manufacturer SAMSUNG

Approx. 2,687,168kWh
Standard Home:about 472 households
Approx. 851t
Plantation:about 60,797 Japanese cedars
Approx. 607t
about 3,107 drums


Gunma
Nakanojyomachi Camp site
Mega Solar Plant

Interconnected Day September 9, 2013
Address Nakanojyomachi,Agatuma Gun,Gunma Prefecture
PV System Size 1 MW
Expected Annual Power Generation 1,112,732 kWh
Panel Manufacturer SAMSUNG

Approx. 1,112,732kWh
Standard Home:about 195 households
Approx. 352t
Plantation:about 25,175 Japanese cedars
Approx. 251t
about 1,286 drums


Gunma
Nakanojyomachi Sawawatari Onsen NO.1
Mega Solar Plant

Interconnected Day November 30, 2013
Address Nakanojyomachi,Agatuma Gun,Gunma Prefecture
PV System Size 2.4 MW
Expected Annual Power Generation 2,497,167 kWh
Panel Manufacturer SAMSUNG

Approx. 2,497,167kWh
Standard Home:about 439 households
Approx. 790t
Plantation:about 56,498 Japanese cedars
Approx. 564t
about 2,887 drums


Gunma
Fujioka City
Mega Solar Plant

Interconnected Day December 2, 2013
Address Fujioka City ,Gunma Prefecture
PV System Size 1.3 MW
Expected Annual Power Generation 1,327,517 kWh
Panel Manufacturer ReneSolar

Approx. 1,327,517kWh
Standard Home:about 233 households
Approx. 420t
Plantation:about 30,035 Japanese cedars
Approx. 300t
about 1,535 drums


Gunma
Nakanojyomachi Sawawatari Onsen NO.2
Mega Solar Plant

Interconnected Day December 20, 2013
Address Nakanojyomachi,Agatuma Gun,Gunma Prefecture
PV System Size 2.4 MW
Expected Annual Power Generation 2,523,599 kWh
Panel Manufacturer SAMSUNG

Approx. 2,523,599kWh
Standard Home:about 444 households
Approx. 799t
Plantation:about 57,096 Japanese cedars
Approx. 570t
about 2,918 drums


Gunma
Kannamachi
Mega Solar Plant

Interconnected Day January 30, 2014
Address Kannamachi,Tano Gun,Gunma Prefecture
PV System Size 1.8 MW
Expected Annual Power Generation 1,889,033 kWh
Panel Manufacturer SAMSUNG

Approx. 1,889,033kWh
Standard Home:about 332 households
Approx. 598t
Plantation:about 42,739 Japanese cedars
Approx. 427t
about 2,184 drums


Ibaragi
Kasama City
Mega Solar Plant

Interconnected Day April 7, 2014
Address Kasama City,Ibaragi Prefecture
PV System Size 1.7 MW
Expected Annual Power Generation 1,620,958 kWh
Panel Manufacturer ReneSolar

Approx. 1,620,958kWh
Standard Home:about 285 households
Approx. 513t
Plantation:about 36,674 Japanese cedars
Approx. 366t
about 1,874 drums


Tochigi
Nasushiobara City Nabekake
Mega Solar Plant

Interconnected Day September 17, 2014
Address Nabekake,Nasushiobara City,Tochigi Prefecture
PV System Size 1.3 MW
Expected Annual Power Generation 1,261,393 kWh
Panel Manufacturer ReneSolar

Approx. 1,261,393kWh
Standard Home:about 221 households
Approx. 399t
Plantation:about 28,539 Japanese cedars
Approx. 285t
about 1,458 drums


Tochigi
Utsunomiya City Shimotawara
Mega Solar Plant

Interconnected Day October 25, 2014
Address Shimotawara,Utsunomiya City,Tochigi Prefecture
PV System Size 0.6 MW
Expected Annual Power Generation 584,705 kWh
Panel Manufacturer ReneSolar

Approx. 584,705kWh
Standard Home:about 102 households
Approx. 185t
Plantation:about 13,228 Japanese cedars
Approx. 132t
about 676 drums


Tochigi
Ootawara City Kodaki
Mega Solar Plant

Interconnected Day November 25, 2014
Address Kodaki,Ootawara City,Tochigi Prefecture
PV System Size 1.9 MW
Expected Annual Power Generation 2,010,621 kWh
Panel Manufacturer ReneSolar

Approx. 2,010,621kWh
Standard Home:about 353 households
Approx. 636t
Plantation:about 45,490 Japanese cedars
Approx. 454t
about 2,325 drums


Saitama
Kumagaya City
Mega Solar Plant

Interconnected Day December 1, 2014
Address Kumagaya City,Saitama Prefecture
PV System Size 2.4 MW
Expected Annual Power Generation 2,499,347 kWh
Panel Manufacturer ReneSolar

Approx. 2,499,347kWh
Standard Home:about 439 households
Approx. 791t
Plantation:about 56,547 Japanese cedars
Approx. 565t
about 2,890 drums


Ibaragi
Ryugasaki City
Mega Solar Plant

Interconnected Day February 26, 2015
Address Ryugasaki City,Ibaragi Prefecture
PV System Size 1.3 MW
Expected Annual Power Generation 1,364,086 kWh
Panel Manufacturer SAMSUNG

Approx. 1,364,086kWh
Standard Home:about 240 households
Approx. 432t
Plantation:about 30,862 Japanese cedars
Approx. 308t
about 1,577 drums


Tochigi
Nikko City NO.1
Mega Solar Plant

Interconnected Day August 13, 2015
Address Nikko City,Tochigi Prefecture
PV System Size 2.4 MW
Expected Annual Power Generation 2,584,037 kWh
Panel Manufacturer ReneSolar

Approx. 2,584,037kWh
Standard Home:about 454 households
Approx. 818t
Plantation:about 58,463 Japanese cedars
Approx. 584t
about 2,988 drums


Tochigi
Mooka City Shimokomoriya
Mega Solar Plant

Interconnected Day October 15, 2015
Address Shimokomoriya,Mooka City,Tochigi Prefecture
PV System Size 1.2 MW
Expected Annual Power Generation 1,161,716 kWh
Panel Manufacturer ReneSolar

Approx. 1,161,716kWh
Standard Home:about 204 households
Approx. 367t
Plantation:about 26,283 Japanese cedars
Approx. 262t
about 1,343 drums


Ibaragi
Hitachioomiya City
Mega Solar Plant

Interconnected Day November 18, 2015
Address Hitachioomiya City,Ibaragi Prefecture
PV System Size 1.6 MW
Expected Annual Power Generation 1,636,840 kWh
Panel Manufacturer ReneSolar

Approx. 1,636,840kWh
Standard Home:about 288 households
Approx. 518t
Plantation:about 37,033 Japanese cedars
Approx. 370t
about 1,892 drums


Tochigi
Nasumachi Terakootsu
Mega Solar Plant

Interconnected Day December 25, 2015
Address Nasumachi,Nasu Gun,Tochigi Prefecture
PV System Size 1.8 MW
Expected Annual Power Generation 2,175,077 kWh
Panel Manufacturer ReneSolar

Approx. 2,175,077kWh
Standard Home:about 382 households
Approx. 688t
Plantation:about 49,211 Japanese cedars
Approx. 492t
about 2,515 drums


Tochigi
Nikko City NO.2
Mega Solar Plant

Interconnected Day March 22, 2016
Address Nikko City,Tochigi Prefecture
PV System Size 2 MW
Expected Annual Power Generation 2,065,313 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 2,065,313kWh
Standard Home:about 363 households
Approx. 654t
Plantation:about 46,727 Japanese cedars
Approx. 467t
about 2,388 drums


Gunma
OICT Midori Town Solar Plant

Interconnected Day November 10, 2014
Address Midori Town,Oota City,Gunma Prefecture
PV System Size 0.2 MW
Expected Annual Power Generation 230,580 kWh
Panel Manufacturer SAMSUNG

Approx. 230,580kWh
Standard Home:about 40 households
Approx. 73t
Plantation:about 5,216 Japanese cedars
Approx. 52t
about 266 drums


Tochigi
Utsunomiya City Himuro
Mega Solar Plant

Interconnected Day June 27, 2016
Address Himuromachi,Utsunomiya City,Tochigi Prefecture
PV System Size 2.4 MW
Expected Annual Power Generation 2,376,260 kWh
Panel Manufacturer ReneSolar

Approx. 2,376,260kWh
Standard Home:about 418 households
Approx. 752t
Plantation:about 53,762 Japanese cedars
Approx. 537t
about 2,747 drums


Gunma
Shibukawa City Akagimachi
Mega Solar Plant

Interconnected Day December 15, 2016
Address Minami-Akagiyama,Shibukawa City, Gunma Prefecture
PV System Size 2.5 MW
Expected Annual Power Generation 2,378,238 kWh
Panel Manufacturer ReneSolar

Approx. 2,378,238kWh
Standard Home:about 418 households
Approx. 753t
Plantation:about 53,807 Japanese cedars
Approx. 538t
about 2,750 drums


Ibaragi
Itaco City
Mega Solar Plant

Interconnected Day October 31, 2017
Address Itako City,Ibaragi Prefecture
PV System Size 2.2 MW
Expected Annual Power Generation 2,510,277 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 2,510,277kWh
Standard Home:about 441 households
Approx. 795t
Plantation:about 56,794 Japanese cedars
Approx. 567t
about 2,902 drums


Chiba
Yachimata City Solar Plant

Interconnected Day August 1, 2019
Address Yachimata City,Chiba prefecture
PV System Size 1.1 MW
Expected Annual Power Generation 1,276,326 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 1,276,326kWh
Standard Home:about 225 households
Approx. 404t
Plantation:about 28,877 Japanese cedars
Approx. 289t
about 1,476 drums


Gunma
Nakanojyomachi Camp site No.2 Solar Plant

Interconnected Day September 1, 2019
Address Nakanojyomachi,Agatuma Gun,Gunma Prefecture
PV System Size 1.5 MW
Expected Annual Power Generation 1,775,175 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 1,775,175kWh
Standard Home:about 312 households
Approx. 562t
Plantation:about 40,163 Japanese cedars
Approx. 402t
about 2,053 drums


Tochigi
Nasushiobara City KamiOonuki
Mega Solar Plant

Interconnected Day March 28, 2020
Address KamiOonuki,Nasushiobara City,Tochigi Prefecture
PV System Size 2.5 MW
Expected Annual Power Generation 3,300,307 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 3,300,307kWh
Standard Home:about 581 households
Approx. 1,045t
Plantation:about 74,669 Japanese cedars
Approx. 747t
about 3,816 drums


Gunma
Nakanojyomachi Kuni Solar Plant

Interconnected Day August 27, 2020
Address Nakanojyomachi,Agatuma Gun,Gunma Prefecture
PV System Size 2.8 MW
Expected Annual Power Generation 2,685,958 kWh
Panel Manufacturer SOLAR FRONTIER

Approx. 2,685,958kWh
Standard Home:about 473 households
Approx. 851t
Plantation:about 60,770 Japanese cedars
Approx. 608t
about 3,106 drums


Chiba
Tatsusawa Shinden
Solar Plant

Interconnected Day March 2, 2021
Address Tomisato City,Chiba prefecture
PV System Size 0.7 MW
Expected Annual Power Generation 989,438 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 989,438kWh
Standard Home:about 174 households
Approx. 313t
Plantation:about 22,386 Japanese cedars
Approx. 224t
about 1,144 drums

Hokuriku Region

Chubu Region

Mie
Ise City Muramatsu
Mega Solar Plant

Interconnected Day March 1, 2014
Address Muramatsu,Ise City,Mie Prefecture
PV System Size 2.1 MW
Expected Annual Power Generation 2,218,207 kWh
Panel Manufacturer ReneSolar

Approx. 2,218,207kWh
Standard Home:about 390 households
Approx. 702t
Plantation:about 50,186 Japanese cedars
Approx. 501t
about 2,565 drums


Shizuoka
Iwata City
Mega Solar Plant

Interconnected Day September 16, 2014
Address Iwata City,Shizuoka Prefecture
PV System Size 1.5 MW
Expected Annual Power Generation 1,743,365 kWh
Panel Manufacturer ReneSolar

Approx. 1,743,365kWh
Standard Home:about 306 households
Approx. 552t
Plantation:about 39,443 Japanese cedars
Approx. 394t
about 2,015 drums


Shizuoka
Fuji City
Mega Solar Plant

Interconnected Day November 28, 2014
Address Fuji City,Shizuoka Prefecture
PV System Size 2.9 MW
Expected Annual Power Generation 3,050,531 kWh
Panel Manufacturer ReneSolar

Approx. 3,050,531kWh
Standard Home:about 536 households
Approx. 966t
Plantation:about 69,018 Japanese cedars
Approx. 690t
about 3,527 drums


Mie
Ise City Shimono
Mega Solar Plant

Interconnected Day January 9, 2015
Address Shimono Town,Ise City,Mie Prefecture
PV System Size 0.9 MW
Expected Annual Power Generation 984,708 kWh
Panel Manufacturer ReneSolar

Approx. 984,708kWh
Standard Home:about 173 households
Approx. 311t
Plantation:about 22,279 Japanese cedars
Approx. 222t
about 1,138 drums


Yamanashi
Hokuto City
Mega Solar Plant

Interconnected Day May 29, 2015
Address Hokuto City,Yamanashi Prefecture
PV System Size 1.6 MW
Expected Annual Power Generation 1,746,957 kWh
Panel Manufacturer ReneSolar

Approx. 1,746,957kWh
Standard Home:about 307 households
Approx. 553t
Plantation:about 39,524 Japanese cedars
Approx. 395t
about 2,020 drums

Kansai Region

Hyogo
Sanda City
Mega Solar Plant

Interconnected Day November 1, 2015
Address Sanda City,Hyogo Prefecture
PV System Size 7.3 MW
Expected Annual Power Generation 7,515,471 kWh
Panel Manufacturer Canadian Solar

Approx. 7,515,471kWh
Standard Home:about 1,322 households
Approx. 2,380t
Plantation:about 170,037 Japanese cedars
Approx. 1,700t
about 8,690 drums


Oosaka
Sakai-city
Mega Solar Plant

Interconnected Day April 21, 2021
Address Sakai-city Oosakafu
PV System Size 2 MW
Expected Annual Power Generation 2,634,757 kWh
Panel Manufacturer Leapton energy

Approx. 2,634,757kWh
Standard Home:about 464 households
Approx. 835t
Plantation:about 59,611 Japanese cedars
Approx. 596t
about 3,047 drums

Chugoku Region

Hiroshima
Higashi-Hiroshima City
Mega Solar Plant

Interconnected Day June 24, 2016
Address Higashi-Hiroshima City,Hiroshima Prefecture
PV System Size 1.8 MW
Expected Annual Power Generation 1,848,027 kWh
Panel Manufacturer ReneSolar

Approx. 1,848,027kWh
Standard Home:about 325 households
Approx. 585t
Plantation:about 41,811 Japanese cedars
Approx. 418t
about 2,137 drums


Hiroshima
Higashi-Hiroshima City Kurose
Mega Solar Plant

Interconnected Day February 26, 2021
Address Higashi-Hiroshima City,Hiroshima Prefecture
PV System Size 1.1 MW
Expected Annual Power Generation 1,343,018 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 1,343,018kWh
Standard Home:about 236 households
Approx. 425t
Plantation:about 30,386 Japanese cedars
Approx. 304t
about 1,553 drums

Shikoku Region

Ehime
Yoshiumikou NO.1
Mega Solar Plant

Interconnected Day April 1, 2014
Address Yoshiumi Town,Imabari City,Ehime Prefecture
PV System Size 2.5 MW
Expected Annual Power Generation 4,447,070 kWh
Panel Manufacturer SAMSUNG

Approx. 4,447,070kWh
Standard Home:about 782 households
Approx. 1,408t
Plantation:about 100,614 Japanese cedars
Approx. 1,006t
about 5,142 drums


Ehime
Yoshiumikou NO.2
Mega Solar Plant

Interconnected Day October 1, 2015
Address Yoshiumi Town,Imabari City,Ehime Prefecture
PV System Size 3 MW
Expected Annual Power Generation 2,884,181 kWh
Panel Manufacturer ReneSolar

Approx. 2,884,181kWh
Standard Home:about 507 households
Approx. 913t
Plantation:about 65,254 Japanese cedars
Approx. 652t
about 3,335 drums

Kyusyu Region

Kumamoto
Yatsushiro City Solar Plant

Interconnected Day January 29, 2015
Address Yatsushiro City,Kumamoto Prefecture
PV System Size 0.6 MW
Expected Annual Power Generation 672,372 kWh
Panel Manufacturer ReneSolar

Approx. 672,372kWh
Standard Home:about 118 households
Approx. 212t
Plantation:about 15,212 Japanese cedars
Approx. 152t
about 777 drums


Kumamoto
Yamato Town
Mega Solar Plant

Interconnected Day February 4, 2015
Address Yamato Town,Kamimashiki Gun,Kumamoto Prefecture
PV System Size 2 MW
Expected Annual Power Generation 2,073,645 kWh
Panel Manufacturer ReneSolar

Approx. 2,073,645kWh
Standard Home:about 364 households
Approx. 656t
Plantation:about 46,916 Japanese cedars
Approx. 469t
about 2,397 drums


Hukuoka
Kuratemachi Solar Plant

Interconnected Day March 2, 2015
Address Kuratemachi,Fukuoka prefecture
PV System Size 0.2 MW
Expected Annual Power Generation 212,371 kWh
Panel Manufacturer ReneSolar

Approx. 212,371kWh
Standard Home:about 37 households
Approx. 67t
Plantation:about 4,804 Japanese cedars
Approx. 48t
about 245 drums


Kagoshima
Hioki City
Mega Solar Plant

Interconnected Day March 31, 2020
Address Hioki City,Kagoshima Prefecture
PV System Size 4.9 MW
Expected Annual Power Generation 7,021,316 kWh
Panel Manufacturer Hanwha Q CELLS

Approx. 7,021,316kWh
Standard Home:about 1,236 households
Approx. 2,224t
Plantation:about 158,857 Japanese cedars
Approx. 1,589t
about 8,119 drums


Hukuoka
Kotake Industrial park
Mega Solar Plant

Interconnected Day October 1, 2020
Address Kotake Town,Kurate Gun,Fukuoka Prefecture
PV System Size 2.6 MW
Expected Annual Power Generation 2,558,230 kWh
Panel Manufacturer SAMSUNG

Approx. 2,558,230kWh
Standard Home:about 450 households
Approx. 810t
Plantation:about 57,880 Japanese cedars
Approx. 579t
about 2,958 drums